[email protected]

9646 Crestview Cir, Villa Park 92861, Villa Park, California, 92861

9646 Crestview Cir, Villa Park 92861, Villa Park, California, 92861

9646 Crestview Cir, Villa Park 92861, Villa Park, California, 92861

Here is some additional information that the Seller would like to share to assist as you tour 9646 Crestview Circle

1. Solar lease until 2032 which is paid in full. Lease #23707 SunPower Escrow Dept: 800-321-1770
With amount of SCE NET METER CREDITS, Seller paid an annual total of $250.12 for July 2021-June 2022. That’s about $20 a month.
2. The property already has an oversized gas meter, meter is restaurant size not residential. This new 2019 meter can easily accommodate demand of expansion/additions if needed. The size does not burden or overuse because it is demand-based delivery. If anyone looking to add ADU or pool, the property already has a large enough meter to accommodate, just need to run the plumbing. Monthly gas was $45-$55
3. Sewer is down on Cannon; sewer line runs down the northeast side of property between concrete steps going down the deck.
4. That black pipe in lower left of this photo is a clean out at the bottom of the sewer line. There is 2 other sewer clean outs at deck entrance and just a little further 3′ down the hill from that.
5. Zoned up to 3 horse property

UPGRADES/IMPROVEMENTS/REPAIRS

*Kitchen Remodel-Built In Fridge 2012 $23k
*BEES in Roof by Dining Room 2012 $525
*Water Filtration 2012 & 2016 $6k
*Front Door – IRON 2012 $11k
*Solar Lease(20YR) SUNPOWER PAID 2013 $16k
*Gate/Matching Ext Railing 2013 $4400
*Exterior front Dwelling Stone Facia 2014 $6k
*Tankless Water Heater Mstr Bath 2014 $1500
*Master Bath Remodel 2014 $32k
*Upstairs Bedroom Pocket Door 2014 $1600
*Front Yard Landscaping/Sprinklers 2015 $2k – 2018 FAILED
*Front Gate Motor Replace 2015 $3k
*Upstairs Window Waterproofed (x8) 2015 $6k
*House Paint Interior/Exterior 2016 $8k
*Stair Rails Interior R&R Match Front Door 2017 $8k
*Fireplace Family Room Marble 2017 $2k
*Mantle R&R Living Room 2017 $1k
*Water Heater R&R MAIN 2017 $1300
*DECK 2017 $130k
*HVAC R&R 2018 $15k
*Gas Meter Relocation 2019 $0
*Flood Lights Security 2019 $2k
*Ovens New Samsung 2019 $4450
*Roof Tile Repair 2022 $700
*Gutter Repair 2022 $700
*Deck Restoration 2022 $3700
*Attic Clean & Re-Insulation 2022 $3700